Glossary
The terms of planning, land and building law in Morocco, defined in one sentence, with the texts that found them.
- 112Terms

A
- Acceptance of works
- Act by which the client accepts the work, with or without reservations, starting the warranty periods.
- Administrative appeal
- Request to the authority that took a decision to reconsider it, prior to a court appeal.
- Adobe
- Sun-dried moulded raw-earth brick.
- Adoul
- Public officer entitled to draw up deeds under Islamic law, including traditional ownership and inheritance deeds.
- Agadir (collective granary)
- Fortified collective granary of the Anti-Atlas where each family owns a storage cell.
- Amended permit
- Additional authorisation required when the project is changed after the initial permit is issued.
- ANCFCC
- National Agency for Land Registry, Cadastre and Cartography, the public body that keeps the land registers and cadastre in Morocco.
- Apostille
- Hague Convention formality certifying the authenticity of a public document for use in another member state.
- Approval stamp (visa)
- Favourable opinion of a consulted service (urban agency, civil protection, utility) required during the review of an authorisation.
- Architect
- Professional registered with the National Order of Architects, alone entitled to design and sign projects subject to authorisation above the legal thresholds.
- Atlas cedar
- Timber of traditional ceilings, doors and joinery, from the Middle Atlas forests.
B
- Bab (gate)
- Monumental gate of a wall, a medina or a palace.
- Bejmat
- Rectangular terracotta brick, glazed or not, laid on floors in herringbone patterns.
- Bhou
- Deep, narrow reception room opening across its full width onto the courtyard.
- Bioclimatic architecture
- Design that uses climate, orientation and materials to limit heating and cooling needs.
- Boundary marking
- Operation by which a surveyor fixes and physically marks the limits of a plot.
- Building envelope (gabarit)
- Maximum envelope within which a building must fit, defined by height and prospect rules.
- Building line (alignement)
- Limit set by the administration between the public road and adjoining properties.
- Building permit
- Act issued by the municipal council president allowing construction, extension or added-floor works to start legally.
C
- Calculation note
- Engineering document justifying the sizing of structural elements.
- Casablanca Art Deco
- 1920s–1930s style in Casablanca combining modern geometry and Moroccan motifs on downtown buildings.
- Certificate of conformity
- Equivalent of the occupancy permit for buildings not intended for housing.
- Certificate of ownership
- Extract issued by ANCFCC stating the owner of a land title and the charges registered at a given date.
- Client (maître d’ouvrage)
- Person on whose behalf the works are carried out, who decides and finances them.
- Collective lands
- Lands belonging to ethnic communities (soulaliyate), subject to a specific land regime under the supervision of the Ministry of the Interior.
- Construction tax
- Municipal tax due when the building permit is issued, calculated on floor area.
- Convertible dirham account
- Bank account funded in foreign currency guaranteeing a non-resident the right to transfer funds back abroad.
- Court appeal
- Action brought before the administrative court against a decision of the administration.
D
- Dar
- Traditional house with a paved central courtyard and no garden, typical of medinas.
- Derb
- Residential lane or cul-de-sac in the medina serving a group of houses.
- Development plan (plan d’aménagement)
- Binding planning document that sets land use, roads, facilities and building rules for a municipality or a sector.
E
- Easement (servitude)
- Burden imposed on a property for the benefit of another property or the public interest, such as a right of way or a setback.
- Engineering consultancy (BET)
- Technical design office in charge of structural and services engineering and calculation notes.
- Exchange Office
- Public body regulating foreign exchange operations and transfers with abroad.
- Extension of validity
- Extension of a permit's validity granted upon reasoned request before it expires.
F
- Finishing and fit-out works
- All works that make the building habitable after the structure: partitions, finishes, joinery, services.
- Floor area coefficient (CUS)
- Land use coefficient: the second ratio set by the zone regulation, complementary to the COS; depending on the regulation it refers to total floor area or to ground footprint, the regulation's definition prevailing.
- Fondouk
- Urban caravanserai with a central courtyard used as warehouse, workshop and lodging for merchants.
G
- Gebs
- Carved plaster in ornamental friezes and panels, characteristic of Moroccan interiors.
- General Building Regulation (RGC)
- General building regulation setting the technical rules applicable to constructions.
- Geotechnical survey
- Soil analysis by a laboratory to determine bearing capacity and size the foundations.
H
- Hammam
- Public bath with successive rooms of increasing temperature, part of the neighbourhood's facilities.
- Historic monument
- Building whose conservation is of artistic, historical or scientific interest and which is protected by inscription or listing under law 22-80 (article 1).
- Housing estate / subdivision (lotissement)
- Division of a property into building plots, governed by Law 25-90, subject to authorisation and servicing works.
I
- Inheritance
- Transfer of a deceased person's estate to heirs, governed in Morocco by the Family Code for Muslims.
- Inscription (heritage)
- Light protection measure taken by ministerial order under law 22-80: the owner of an inscribed building must notify the administration six months before any restoration or alteration (article 6) and declare any sale.
J
- Joint ownership (indivision)
- Situation where several people hold rights over the same property together without it being physically divided.
K
- Kasbah
- Fortified residence or citadel, often of rammed earth, seat of a local power or garrison.
- Khettara
- Underground drainage gallery, gently sloping and punctuated by access shafts, that brings groundwater to a palm grove or a town without pumping; the traditional technique of the oases and of the Marrakech region.
- Ksar
- Fortified earthen village of southern Morocco, with covered lanes and adjoining houses.
L
- Land registration
- Procedure by which a property is entered in the ANCFCC land registers and receives a title after survey and clearance of oppositions.
- Land title (titre foncier)
- Document issued by ANCFCC that definitively establishes ownership of a registered property and the rights attached to it.
- Law 016-89
- Law on the practice of the architectural profession and the creation of the National Order of Architects.
- Law 12-90
- Planning law organising planning documents and the building permit regime.
- Law 22-80
- Law of 25 December 1980, amended by law 19-05 in 2006, on the conservation of historic monuments and sites, inscriptions, objects of art and antiquities; it organises inscription, listing, the State's pre-emption right and penalties. A law 33-22 meant to replace it was between the two houses of parliament in 2025.
- Law 25-90
- Law on subdivisions, housing groups and plot divisions.
- Law 66-12
- Law on the control and punishment of planning and building offences.
- Lime
- Traditional binder made by burning limestone, used in mortar and breathable renders.
- Listing (heritage)
- Strong protection measure taken by decree after an inquiry under law 22-80: a listed building may not be demolished without delisting, nor restored, altered or built upon without the administration's authorisation (articles 20 to 22); the listing is recorded on the land title.
M
- Madrasa
- Religious teaching institution arranged around a courtyard, with a prayer hall and student cells.
- Mashrabiya
- Openwork panel of turned wood filtering light and preserving privacy.
- Medina
- Historic walled city with a dense fabric of lanes and courtyard houses.
- Melkia
- Traditional deed drawn up by adouls for an unregistered property, proving possession without the guarantees of a land title.
- Menzeh
- Pavilion or belvedere opening onto a garden or terrace.
- Mihrab
- Niche in the qibla wall of a mosque indicating the direction of Mecca.
- Minaret
- Mosque tower from which the call to prayer is made, square in plan in the Moroccan tradition.
- Moroccan living abroad (MRE)
- Moroccan residing abroad, a status that opens certain rights regarding exchange control and taxation.
- Municipality (commune)
- Local authority whose president issues building permits and occupancy permits.
- Muqarnas
- Stalactite ornament in plaster or wood forming the transition between a square plan and a dome.
N
- Neo-Moorish
- Protectorate-era style applying a Moroccan decorative vocabulary to buildings of European design.
- No-build zone
- Zone where all construction is prohibited, for instance along a road, a wadi or a power line.
- Notary
- Public officer who draws up and authenticates deeds, notably sales of registered property.
O
- Occupancy permit
- Authorisation issued after completion certifying that the building complies with the permit and may be occupied.
- Official Gazette
- Official publication of the Kingdom where laws, decrees and orders appear, in Arabic with a French translation edition.
- ONA
- National Order of Architects, the professional body that keeps the register of architects and oversees ethics.
- One-stop shop
- Municipal arrangement that centralises the filing and review of planning applications, now online through the Rokhas platform.
- Opposition
- Claim lodged by a third party during the registration procedure to assert a right over the property.
P
- Patio
- Open-air inner courtyard around which the rooms of a house are arranged.
- Planning derogation
- Exceptional authorisation to depart from the development plan rules, granted by a regional committee under defined criteria.
- Planning information note
- Document issued by the urban agency stating the planning rules applicable to a plot.
- Power of attorney
- Deed by which a person gives another the power to act on their behalf, to be legalised and, depending on the country, apostilled.
- Pre-emption right (heritage)
- The State's right under law 22-80 to buy an inscribed or listed building offered for sale ahead of any buyer, exercised within two months of the sale declaration; an undeclared sale is void (articles 37 to 41).
- Prior declaration
- Simplified formality applicable to certain minor works that do not require a full building permit.
- Project lead (maître d’œuvre)
- Professional, usually the architect, who designs the project and directs the works on the client's behalf.
- Prospect rule
- Rule linking the height of a building to its distance from boundaries or neighbouring buildings.
Q
- Qualified and classified contractor
- Construction company holding a qualification and classification certificate issued by the Ministry of Equipment.
- Quotation
- Priced document by which a contractor offers works at a defined price and conditions.
R
- Rammed earth (pisé)
- Raw earth compacted in layers inside formwork to form thick load-bearing walls.
- Registration application (réquisition)
- Application filed with the land registry to start the registration of a property, opening a period for oppositions.
- Regularisation
- Procedure to bring a building erected without a permit or in breach into compliance, where the law allows it.
- Riad
- Traditional urban house organised around a planted inner courtyard, closed to the street and open to the sky.
- Roof terrace
- Accessible flat roof of the traditional house, a domestic space and the only opening onto the city.
S
- Sebka
- Decorative lattice of interlaced lozenges carved on Almohad façades and minarets.
- Seismic building code (RPS)
- Seismic building regulation imposing design and execution rules against earthquake risk.
- Setback
- Minimum distance required between a building and the road or the plot boundaries.
- Site coverage ratio (COS)
- Site coverage coefficient: ratio set by the zone regulation between a built area and the plot area; depending on the regulation it refers to the ground footprint or to the total floor area, so the applicable regulation's definition must be read.
- Skifa
- Bent entrance corridor protecting the privacy of the courtyard from the street.
- Structural works
- All works ensuring the stability and strength of the building: foundations, structure, load-bearing walls, floors, roof.
- Subdivision (morcellement)
- Division of a property into several lots, requiring authorisation when a lot is intended for housing or activity.
- Surveyor
- Professional who produces topographic plans, boundary markings and cadastral documents.
T
- Tadelakt
- Lime plaster polished with a stone and treated with black soap, waterproof, used in hammams and bathrooms.
- Technical inspection body
- Independent body that checks structural soundness and safety, required for certain projects and by insurers.
- Ten-year liability insurance
- Insurance covering, for ten years after acceptance, damage compromising the soundness of the work.
- Thermal building code (RTCM)
- Moroccan thermal building regulation setting energy performance requirements for the building envelope.
- Tighremt
- Fortified tower-house of the Atlas and the South, square in plan with corner towers.
U
- UNESCO World Heritage
- Sites listed by UNESCO for their universal value, subject to reinforced protection rules.
- Urban agency
- Public body in charge, within its area, of planning studies and of reviewing authorisation applications.
- Urban master plan (SDAU)
- Master plan setting the long-term development orientations of a metropolitan area.
W
- Wilaya
- Administrative region headed by a wali, which coordinates in particular the regional planning committees.
- Works contract
- Contract binding the client and the contractor for defined works.